Applicate at building exterior wall insulation
On the premise of ensuring to meet the requirements of energy saving and heat preservation, the strength can meet the standard requirements of exterior decoration. There is no need for another protective layer or waterproof layer, which is constructed like ordinary cement mortar. It can be directly drilled and painted on the insulating layer.
Applicate at building interior wall insulation
On the premise of ensuring to meet the requirements of energy conservation and heat preservation, the strength can reach the standard of interior decoration, and can be directly decorated on the heat preservation mortar; the fire protection grade can completely meet the requirements of fire protection and fire prevention. Moreover, the construction is simple and convenient, which is the same as the traditional ordinary mortar construction technology.
General provisions
The construction scope and thickness of thermal insulation of microcrystalline inorganic thermal insulation mortar external wall (inner wall) shall meet the design requirements.
The construction unit shall carry out the construction according to the product description of the facrory
The construction unit should make a sample before carrying out large-scale construction.
construction
Material preparation: when the required materials enter the site, they shall be registered and inspected in accordance with relevant regulations, and shall be properly stored and managed.
Water and electricity preparation: distribute the power supply and water source according to the construction demand, and the water quality should conform to 《water standard for concrete mixing》JGJ63.
Tool preparation: before construction, the tools should be prepared in place, and the completeness of the tools and the debugging of the equipment should be carried out.
Staff training: the point is on products, technology, construction steps, precautions, safety measures and civilized construction.
Construction conditions: all embedded parts of the wall must be installed before this construction.
Protection of finished products: protect all embedded parts and management on the construction site to avoid damage or damage during construction.
Check and accept the base before construction, the base should be cleaned up, its surface flatness, verticality should meet the corresponding specification requirements.
When the microcrystalline inorganic thermal insulation mortar is used in the renovation project of the building, the base must be solid, and the powder of the original decoration surface should be cleaned.
maintain
Spray water and maintain it for more than seven days after painting to prevent the paste from reducing its strength and surface cracking.
| 亚洲精品无冯一区二区三区在线观看 | 欧美农村裸交A片 | 中文无码又大又粗又硬一级A片 | 嫩嫩BBBBBBBBB免费网站 | av国产在线国产一区 | 国产伦精品一区二区三区二区 | 中文字幕在线播放器 | 91久久精品國產亞洲 | 午夜成人在线观看 | 国产全肉乱妇杂乱视频在线观看 | 亚洲Av成人片一区 | 亚洲一区二区三区色 | 国产t66y满18| 中国一级老女人A片 | 人_禽—乱—交—视—频 | 少妇风流欧美精品A片 | 欧亚乱熟女一区二区在线 | 人人揉揉了人人插 | 国产成人电影在线观看 | 精品福利一区二区三区 | 性高潮黑丝少妇夜夜嗨 | 色噜噜狠狠一区二区三区牛牛影视 | 色色五月天激情综合 | 国产精品V亚洲精品V日韩精品 | 国产一区精品视频 | 精品乱子伦一区二区三电影 | 黄色视频网站在线免费 | 少妇高潮惨叫久久久久久以以 | 九七精品熟女少妇一区二区三区 | 精品成人无码久久久久久 | 亚洲AV,秘无码,,18禁 | 日韩无码人妻精品 | 91人妻人人澡人人爽人人精品 | 国产精品久久久久无码免费 | 欧美一级AAAAAAABBBBBB片 | 在线一级中文字幕网站网址 | 2019中文在线高清观看电视剧 | 卡通动漫 欧美 日韩 东京热 | A片男女色情A片免费姬媚直播 | 真人无吗avvvvv |